Fair warning, this is a long, picture heavy post...
Here's the updated list...I managed to cross a few things off of it. But I have less than a month and a half and I have the feeling that I'm going to be working up until the very end of the deadline.
- Support beams for the ceilings of the upper and
lower level. Build the corners of the containers and glue them to the long walls.Glue in flooring for the upper level, stain and sand it.Figure out bathroom flooring& put it in.Build the bathroom wall- Build
the closet Build transom windows for upper levelFold & prime the corner lift pieces- Make the four handles for the container doors
Stain closet & Bathroom doors - convert to barn doorsCut the roofPrime the walls, roof & stairsPaint the walls & roof- Make supports for the overhang/carport
- Base & steps for house (cinderblocks? or skip this)
- Landscaping
- Posts & railings for roof patio
- Roof patio decking? Tongue depressors?
- Prime & paint posts & railings of roof patio
- Make bifold doors for upper level
- Make floor to ceiling windows for upper level
- Make frames for all floor to ceiling windows
Make sink cabinet for bathroom- Make 'glass' door for shower (Do shower curtain instead?)
Tile shower walls & soap niche- Grout shower walls
- Lighting.
- Bathroom overhead (chains & bulb)
- Over front door
- On either side of bifold for roof patio
- Kitchen pendant lights
- Living room lights
- Light in upstairs office
- Bedroom lights
- Furniture for bedroom
- Furniture for living room
- Spider plants in macrame holders for kitchen window?
- Install kitchen cabinets, faucet, appliances, backsplash & floating shelves
- Install bathroom fixtures
- Rugs & pillows
- Books
- Cats
Started the new job on the 25th. Very nice people, wonderful woman trained me for two days straight before she had to go back to the main accounting office and she's made sure I know that she's available for help.
It's weird being hourly but at the same time its nice because every salary job I've had, I've ended up stressed and working way too much.
The week before I started work I worked constantly on the Container House. It suddenly occured to me that I have not a lot of time left. But I'm slowly whittling down the list.
One of the big things was getting all the walls primed and painted. The concrete on my front porch is also primed and painted due to the spray paint and primer.
I still have a few other things that need painting and some of the walls need some touch ups but for the most part the painting is done.
I am happy to say that I finished tiling the shower walls and the shampoo niche.
Grout and sealant is the next step. I just finished the tile this weekend. And wow. Every time I do something like this I remind myself that they make really nice 'tile' wallpaper that will save my back and eyes.
But it's soooooo pretty...
Ahem...
The upstairs floors are another finished task. Mostly. I only need to add a little transition metal plate between the wood and tile. I used a vinyl tile with a marble pattern for the bathroom floor and cut it into one inch squares.
The bedroom/sitting area got the tongue depressor treatment just like the main floor.
I like how it looks so far. The wood floor is a little darker than the downstairs but I think that's fine for a bedroom.
I built the bathroom wall. And tested out the barn door for it. So far so good. Still debating wallpaper choices.
With all these cuts and angles I'm really grateful for the power saw. It goes through MDF really easily. It makes it a lot easier to use pieces of the kit's MDF. Though I do need to keep the upper level as light as possible so most of the MDF is on the lower level.
The closet and doors took me a bit of time and ended up slightly wider than I'd originally pictured but I like how it looks.
I need to adjust one wall slightly to cover the gap made by the doors but other than that, I love it.
And just because I had them and I like the idea of a 'closet system' I got my little drawers and a cube shelf and tested out the wonderful shoes and purse I got from Patrizia Santi's store. Her original instagram disappeared so if you used to follow her go and find her again because she's got some awesome stuff out!
I might switch out the purse on the right with one from NOLA House just to get a bit more color in there.
I tested out some more wallpaper but I still haven't made any decisions yet. I really need to bite the bullet and figure it out.
I like the colorful aspect of the first one. It has a lot of the same colors as the floral one I like so much. The last one...It's a little too plain I think.
The other thing I did was the angled transom windows for over the container doors and the exterior bathroom wall. Geometry and I don't get along but I managed to figure it out.
And the last thing... I started working on the cabinet for the sink in the bathroom. I'm bashing a Dry Sink House of Miniatures kit and modernizing it a bit.
I sanded the top of the cabinet so that the vessel sink fit a bit better and I'll get some veneer to cover the joins of the shelves and sides. I think I'll also get a piece of the 'marble' tile I used for the floors and do the countertop under the sink with it. Or maybe the white glitter contact paper I used for the kitchen counters. Still thinking about that one.
But that's some progress. Not a lot when I consider the list but I'll get it done.
I hope everyone is having a wonderful Halloween! And here are a few Halloween themed pics that seem appropriate.





































